The clearance hours page divides the size of the window-sash lead removal by what one crew finishes in a day. The result is labor, not a promise that the clearance before reoccupancy is open.
Hugo uses those same two numbers on the phone so the board matches the conversation. The component list still has to be confirmed.
Travel, a locked gate, and a failed inspection sit outside the fraction.
